Connectivity across Southeast Asia

What is already clear, and what still needs federal approval

Land and factories sit with NGX. Manufacturing licences and tax incentives sit with MIDA and are subject to MIDA final approval. Kedah and the Northern Corridor handle the state side.

Subject to MIDA Final Approval

Northern Gateway Sdn Bhd (NGX)

Wholly owned master developer under the Minister of Finance (Incorporated). It can discuss land leases, built-to-suit factories, park operating rights, and property management.

It cannot grant tax incentives, manufacturing licences, or expatriate quotas. This site does not treat operating rights as already vested in the Alliance.

Malaysian Investment Development Authority (MIDA)

Under the Ministry of Investment, Trade and Industry. It issues manufacturing licences, tax exemption orders, and expatriate quotas project by project.

Delapan has no park-wide licence or exemption order. A tax assurance from NGX counts only when MIDA issues the paper.

Invest Kedah and the Northern Corridor Implementation Authority (NCIA)

State investment promotion, and corridor execution after Delapan's listing in the 2026 federal budget.

State support is not a federal exemption order, and it is not a completed special-zone statute.

Certainty
Approving authority

12 entries

Master-developer mandate

L1 verifiedNGX

NGX is wholly owned by the Minister of Finance (Incorporated) and is master developer of the Delapan border zone. Chief executive: Razwin Sulairee Hasnan Termizi. Project lead: Badri. AREA Group, whose executive chairman is Datuk Stewart LaBrooy, was commissioned by NGX in 2023 for design, financing, and development.

Applies toThe estate itself. The landlord does not change by industry.

ConditionsLand and factory contracts are with NGX, not with the Alliance.

SourceNGX English deck; The Edge Malaysia (September 2026); Alliance briefing, as of 27 November 2026.

Scale and border distance

L1 verifiedNGX

The overview states 4,400 acres. The same deck prints Delapan West at 2,140 acres and Delapan East at 2,255 acres. Distance to the Malaysia–Thailand border: 800 metres, directly connected to the Bukit Kayu Hitam ICQS.

Applies toThe whole estate.

ConditionsNGX describes the land as a free industrial zone, 4,400 acres in the overview. Tax incentives are a separate MIDA approval.

SourceNGX English deck.

Power, water, solar, and gas

L1 verifiedNGX

Power 2 GW at 500 kV, water 229 MLD, solar above 300 MW, gas 1.2 GW.

Applies toPower- and water-intensive manufacturing, data, and energy projects still need their own connection design.

ConditionsProject material, pending official confirmation. These are estate specifications, not a utility contract already signed by any one company.

SourceProject material, pending official confirmation. Power and water figures come from the investment deck and are not a verified utility contract.

Dual landings and the internet exchange

L1 verifiedNGX

Project material, pending official confirmation. The Satun and Songkhla landings are described as connecting back to Delapan at D8-1. Open DC and DE-CIX are described at the same place. The cable count is not verified line by line.

Applies toData centres, cloud, and content distribution.

ConditionsProject material, pending official confirmation. The Satun and Songkhla landings are described as connecting back to the park digital node and to Open DC × DE-CIX.

SourceProject material, pending official confirmation. From the NGX deck. System names are not verified one by one.

Anchors named in the deck

L1 verifiedNGX

The PKT Logistics inland port is printed at 240,000 TEU. A Kuehne+Nagel release cites 250,000 TEU of yard capacity. The two figures are not merged. NCT InnoSphere is 130 acres. Hartalega on the map is still planning or concept, not a producing neighbour. AREA Group's ADCC is a plan. None of these are Chinese tenants of Delapan.

Applies toLogistics, cleaner manufacturing, and data.

ConditionsThese are names on the NGX map, not Chinese case studies and not clients interviewed for this site. Take-up and buyer mix are not used as a headline.

SourceNGX English deck.

Heads of Agreement, 11 April 2025

L2 frameworkInvest Kedah & NCIA

What was signed in Shenzhen is a Heads of Agreement, not an investment contract in force. The text states a total investment figure of USD 22 billion and an FDI attraction target of USD 2 billion. The USD 2 billion is a target, not a sum allocated to the Alliance or to any one company.

Applies toThe framework covers both parks. This site develops Delapan only.

ConditionsAlways with the qualifier “framework, not yet effective”. Signatories are listed on the Alliance page. They are not rewritten here as a tax grant by NGX.

SourcePeople's Daily Shenzhen, China News Service, and Economic Daily (11–12 April 2025); The Edge Malaysia (September 2026).

Listed in the 2026 federal budget

L2 frameworkInvest Kedah & NCIA

Delapan is included in the 2026 federal budget. NCIA is the northern-corridor execution body. A budget line is momentum, not a licence in a tenant's hands.

Applies toEstate level. Not an automatic sector approval.

ConditionsState it as framework, not yet effective.

SourceAlliance briefing, as of 27 November 2026.

Public pledge to accelerate federal approval

L2 frameworkMIDA

On 19 November 2026 in Shenzhen, Prime Minister Anwar Ibrahim announced RM 9.2 billion (about USD 2 billion) of preliminary investment intent from the visit, across Kedah, Penang, Selangor, and Pahang, and said the federal government would accelerate approvals, with details to be published by MIDA.

Applies toThe surrounding meetings touched new energy, digital technology, medical technology, and advanced manufacturing. That is not an admission list for Delapan.

ConditionsThis is the Prime Minister's public commitment to faster approvals. MIDA publishes the project list. Tax incentives remain subject to final approval.

SourceBernama, 19 November 2026, as logged in the Alliance briefing of 27 November 2026.

Tax exemption order

Subject to MIDA Final ApprovalMIDA

Corporate-income exemption is a project-level MIDA decision under an Income Tax exemption order. The granting body is MIDA, not NGX and not the Alliance.

Applies toManufacturing and services apply separately. There is no estate-wide rate.

ConditionsNeither the rate nor the term is approved. A clause without an instrument number and a source text cannot enter external material or a financial model.

Pending Approval. This entry states no rate and no term.

SourceThe institutional split is in the Alliance briefing. This site has no exemption order to cite.

Manufacturing licence and expatriate quotas

Subject to MIDA Final ApprovalMIDA

Manufacturing licences and quotas for expatriate professionals and foreign workers are MIDA decisions, project by project. Delapan has no blanket licence.

Applies toAny project that manufactures in Malaysia.

ConditionsApply case by case. Hiring and TVET can start; a quota cannot be treated as granted.

Pending Approval. This entry states no quota.

SourceMIDA's role is set out in the Alliance briefing. As of 27 November 2026 this site lists no approved company.

Land tenure

Subject to MIDA Final ApprovalNGX

NGX holds the land as master developer. Tenure is not stated in any approval this site can cite.

Applies toEvery project that needs land.

ConditionsThis site reaches no conclusion on title. A contract form should wait until an approval distinguishes the tenure.

Pending Approval. This entry states neither title nor term.

SourceNGX's role as landlord is in the NGX materials and The Edge Malaysia. Tenure is pending in the Alliance briefing.

Special-zone law and customs time

Subject to MIDA Final ApprovalInvest Kedah & NCIA

A special-zone statute for the border park is not yet enacted. No customs-time commitment can be cited. ICQS operates the checkpoint, not the Alliance.

Applies toAny project that depends on bonded status, transit, or a time limit is constrained by this entry.

ConditionsThe legal basis, any preference, the conditions, and clearance time all wait on the federal process. Customs brokerage can start. A time limit cannot enter a proposal.

Pending Approval. This entry states no rate, no term, and no clearance time.

SourceAlliance briefing, which marks special-zone legislation and customs time as pending; border distance from the NGX deck.