How the goods move, and how far the plot is
Goods enter Malaysia from Sadao in Thailand, at Bukit Kayu Hitam. BKH ICD has been in operation since 1 May 2025, for clearance, cross-border trailer swap, consolidation, and reefer boxes. Southbound, the North–South Expressway leads to Penang port. Do not plan on 90 km to Bangkok port. That figure is wrong.
| Place | Distance | Source |
|---|---|---|
| Malaysia–Thailand checkpoint | About 800 metres | Project figure |
| Penang port | About 88 km. About 88.2 km via the North–South Expressway | Kedah investment material (2022) |
| Penang airport | About 95 km | Kedah investment material |
| Hat Yai airport | About 50–60 km | An order of magnitude. Methods differ, so this site does not lock one point |
| Kulim Hi-Tech Park | About 140–160 km by road, about 1.5–2 hours | Routes differ, so the site states a range |
| Bangkok | About 980 km by road, about 14 hours | Road distance. Not a radius to Bangkok port |
Kuehne+Nagel and City Zone Express are anchor tenants of BKH ICD, not factory tenants of Delapan. The Kuehne+Nagel release cites 250,000 TEU of yard capacity. That is not the whole park running at capacity.
Contrasts, one line each
- The Thai EEC is on the east coast. A Thai border is not the auto plants.
- Penang and Kulim are the electronics belt. This site is a supplement when you also need the checkpoint. It is not the first choice for that belt.
- Johor is closer to traffic toward Singapore. Kedah Rubber City is a different park.