Masterplan of Delapan East and West

The checkpoint, the power, the cables, the eight-day road

The masterplan, the checkpoint, power, and cables. The 8-day Shanghai–Singapore figure, 2 GW, and cable counts are project material pending official confirmation. Distances are the ones on the location page.

Extent
Layers
MalaysiaThailandStrait of MalaccaAndaman SeaGulf of ThailandLangkawi
100 km

Select a city for the checkpoint, the ports, and the cables. Rings mark 50, 100, and 150 km.

Shanghai to Singapore

8

days, door to door

Project material, pending official confirmation. Shanghai to Sadao–BKH, then Singapore, overland.

56%

cheaper than air

Project material, pending official confirmation. NGX's cost comparison for that road journey. The deck states no air duration.

15

days by sea

Door to door for the same journey by sea.

7%

above sea freight

Road versus sea, before the Red Sea disruption.

NGX names Dimerco, Yamato Transport, DB Schenker, and Siam Shipping as corridor carriers using Sadao–Bukit Kayu Hitam. They are not park tenants.

31 arrangements, 150 kilometres

FTA utilisation is not a tariff preference already granted to the park. Each shipment still depends on origin.

31

FTAs

Malaysia and Thailand, 2023.

65

countries

Coverage as printed by NGX.

76%

average utilisation

On a utilisation base of USD 315 billion, 2023.

150 km total

4,406,817

Malaysia 2.73 million and southern Thailand 1.66 million, as printed by NGX.

Radius Malaysia Thailand Total
50 km 1.08 0.52 1.61
100 km 1.79 1.32 3.11
150 km 2.73 1.66 4.40

Millions, as printed on the NGX plate. A separate line gives 4,406,817 people at 150 km. The rounded millions do not equal that integer, and this site does not merge them into a new figure.

Estate capacity, not a signed customer contract

2 GW

Power

Project material, pending official confirmation. 500 kV.

229

MLD water

An estate figure, not a customer contract.

300 MW+

Solar

And above.

1.2 GW

Gas

Stated separately from grid power.

Project material, pending official confirmation. Satun lands on the Andaman coast in La-ngu. Songkhla lands at Singhanakhon, facing the Gulf of Thailand. The deck says both connect back to D8-1 and to Open DC × DE-CIX. It names no cable system, and the count is not verified line by line.

Distances, from the sources on the location page

800 m

Malaysia–Thailand checkpoint

Project figure

88 km

Penang port

Kedah investment material (2022), about 88.2 km via the North–South Expressway

95 km

Penang airport

Kedah investment material

50–60 km

Hat Yai airport

Order of magnitude, not a single locked point

140–160 km

Kulim Hi-Tech Park

Road range, about 1.5–2 hours

980 km

Bangkok

About 14 hours by road. Not 90 km to Bangkok port

Rail Padang Besar Station, Kodiang Station

Highways Asia Highway 2, Northern Corridor Highway, West Coast Expressway, Garden Highway (Thailand)

Inland ports BKH Inland Port, Delapan, Padang Besar Inland Port, Perlis

Names the deck actually prints

PKT Logistics

The BKH inland port. 240,000 TEU, 200,000 sq ft of free-commercial-zone warehouses, gold-rated Green RE. Pre-clearance includes VGM for Penang Port, Port Klang, and Singapore. Administration, lodging, a logistics institute, the yard, and repair are on the same plate. This is capacity, not a measured annual throughput.

NCT InnoSphere

130 acres. The deck calls it the first silver-rated Green RE industrial park in Kedah, with solar, for industries that use raw materials and the ecosystem of southern Thailand.

Hartalega

Hartalega's glove park in the Kedah border zone still reads, at the end of 2026, as planning or concept. It is not a producing neighbour, and it is not a Delapan tenant.

AREA Group · ADCC

A data-centre name on the ecosystem map. AREA is also the design, financing, and development adviser commissioned by NGX in 2023. The two facts stay separate and are not merged into an operating right.

Open DC × DE-CIX

Open DC's D8-1 is in the Delapan border zone. In October 2026 the company called it Kedah's first TIA-942 Rated 3 facility, facing north. A full DE-CIX node is, on the company's account, aimed at the fourth quarter of 2026 through the first quarter of 2027. That shows one operator's facility, not a park-wide data-centre cluster. AREA's large campus is still a plan.

Three figures, three geographies

Annual trade through Bukit Kayu Hitam

Over RM 50 billion

NGX overview, which also states 6 million cross-border tourist movements a year.

Malaysia–Thailand trade via the BKH ICQS and inland port, 3 km radius

Over RM 80 billion

NGX stage page. The scope is Malaysia–Thailand trade, not the checkpoint figure above.

Northern Malaysia–southern Thailand routes

RM 70 billion a year, and growing

NGX map note. Passenger crossings are given as 5 to 6 million.

Malaysia–Thailand, 2024

USD 13.55 bn

Total bilateral trade

USD 5.82 bn

Malaysia to Thailand (marked est.)

USD 7.73 bn

Thailand to Malaysia (marked est.)

USD 6.85 bn

Transshipment

5.80 million

Malaysian tourist entries to Thailand

6.20 million

Outbound travellers

730,000

Vehicles crossing

Container nodes, 2024

191,445

Bukit Kayu Hitam TEU

156,665

Padang Besar TEU

626,661

Southern Thai cargos TEU

15,667

Ipoh Cargo Terminal TEU

62,666

Krabi / Kantang TEU

In 2023, most ASEAN exports stayed in Asia-Pacific

ASEAN exports, 2023, million tonnes. Source printed as IHS WTS (20 Nov 2023). The deck also prints 89% and says almost 90 percent stay in Asia-Pacific, with an Asia-Pacific line of 1,210.50 million tonnes. The percentage is quoted, not recomputed from the bars.

Indonesia 691.08
Malaysia 197.53
Rest of world 149.32
Vietnam 139.87
Singapore 134.64
Thailand 125.29
Philippines 62.84
Cambodia 8.57

Training names inside the radius

Universiti Utara Malaysia, Universiti Malaysia Perlis, Kolej Komuniti Bandar Darulaman, Giat MARA Kubang Pasu, Politeknik Sultan Abdul Halim Mu'adzam Shah, Akademi Binaan Malaysia (ABM) Wilayah Utara, Kampus Satelit CIAST, Kolej Pertanian Malaysia, Bukit Tangga, Institut Latihan Perindustrian Jitra, Institut Kemahiran Belia Negara Jitra, Pusat Latihan dan Bimbingan Veteran ATM, Jitra, CIDB Technologies Sdn Bhd (Kedah)

The three ringgit trade figures cover different geographies. They are not added and not swapped. Bilateral Malaysia–Thailand trade of about USD 13.55 billion in 2024 is a further plate, and the directional split is marked as an estimate.

The container figures are 2024 nodes that can be read on their own, not a capacity that can be summed. PKT's 240,000 TEU is inland-port capacity and is not the same number as the 191,445 TEU Bukit Kayu Hitam node. Penang Port and Port Klang are footnoted on the source as consolidated inflows from Padang Besar and BKH; the labels do not isolate them, so they are not repeated.

The institutions are copied from the NGX materials to show that training capacity exists in the radius. Nothing is called a partnership unless one has been signed.