8
days, door to door
Project material, pending official confirmation. Shanghai to Sadao–BKH, then Singapore, overland.
The masterplan, the checkpoint, power, and cables. The 8-day Shanghai–Singapore figure, 2 GW, and cable counts are project material pending official confirmation. Distances are the ones on the location page.
Select a city for the checkpoint, the ports, and the cables. Rings mark 50, 100, and 150 km.
8
days, door to door
Project material, pending official confirmation. Shanghai to Sadao–BKH, then Singapore, overland.
56%
cheaper than air
Project material, pending official confirmation. NGX's cost comparison for that road journey. The deck states no air duration.
15
days by sea
Door to door for the same journey by sea.
7%
above sea freight
Road versus sea, before the Red Sea disruption.
NGX names Dimerco, Yamato Transport, DB Schenker, and Siam Shipping as corridor carriers using Sadao–Bukit Kayu Hitam. They are not park tenants.
FTA utilisation is not a tariff preference already granted to the park. Each shipment still depends on origin.
31
FTAs
Malaysia and Thailand, 2023.
65
countries
Coverage as printed by NGX.
76%
average utilisation
On a utilisation base of USD 315 billion, 2023.
4,406,817
Malaysia 2.73 million and southern Thailand 1.66 million, as printed by NGX.
| Radius | Malaysia | Thailand | Total |
|---|---|---|---|
| 50 km | 1.08 | 0.52 | 1.61 |
| 100 km | 1.79 | 1.32 | 3.11 |
| 150 km | 2.73 | 1.66 | 4.40 |
Millions, as printed on the NGX plate. A separate line gives 4,406,817 people at 150 km. The rounded millions do not equal that integer, and this site does not merge them into a new figure.
2 GW
Power
Project material, pending official confirmation. 500 kV.
229
MLD water
An estate figure, not a customer contract.
300 MW+
Solar
And above.
1.2 GW
Gas
Stated separately from grid power.
Project material, pending official confirmation. Satun lands on the Andaman coast in La-ngu. Songkhla lands at Singhanakhon, facing the Gulf of Thailand. The deck says both connect back to D8-1 and to Open DC × DE-CIX. It names no cable system, and the count is not verified line by line.
800 m
Malaysia–Thailand checkpoint
Project figure
88 km
Penang port
Kedah investment material (2022), about 88.2 km via the North–South Expressway
95 km
Penang airport
Kedah investment material
50–60 km
Hat Yai airport
Order of magnitude, not a single locked point
140–160 km
Kulim Hi-Tech Park
Road range, about 1.5–2 hours
980 km
Bangkok
About 14 hours by road. Not 90 km to Bangkok port
Rail Padang Besar Station, Kodiang Station
Highways Asia Highway 2, Northern Corridor Highway, West Coast Expressway, Garden Highway (Thailand)
Inland ports BKH Inland Port, Delapan, Padang Besar Inland Port, Perlis
The BKH inland port. 240,000 TEU, 200,000 sq ft of free-commercial-zone warehouses, gold-rated Green RE. Pre-clearance includes VGM for Penang Port, Port Klang, and Singapore. Administration, lodging, a logistics institute, the yard, and repair are on the same plate. This is capacity, not a measured annual throughput.
130 acres. The deck calls it the first silver-rated Green RE industrial park in Kedah, with solar, for industries that use raw materials and the ecosystem of southern Thailand.
Hartalega's glove park in the Kedah border zone still reads, at the end of 2026, as planning or concept. It is not a producing neighbour, and it is not a Delapan tenant.
A data-centre name on the ecosystem map. AREA is also the design, financing, and development adviser commissioned by NGX in 2023. The two facts stay separate and are not merged into an operating right.
Open DC's D8-1 is in the Delapan border zone. In October 2026 the company called it Kedah's first TIA-942 Rated 3 facility, facing north. A full DE-CIX node is, on the company's account, aimed at the fourth quarter of 2026 through the first quarter of 2027. That shows one operator's facility, not a park-wide data-centre cluster. AREA's large campus is still a plan.
Over RM 50 billion
NGX overview, which also states 6 million cross-border tourist movements a year.
Over RM 80 billion
NGX stage page. The scope is Malaysia–Thailand trade, not the checkpoint figure above.
RM 70 billion a year, and growing
NGX map note. Passenger crossings are given as 5 to 6 million.
USD 13.55 bn
Total bilateral trade
USD 5.82 bn
Malaysia to Thailand (marked est.)
USD 7.73 bn
Thailand to Malaysia (marked est.)
USD 6.85 bn
Transshipment
5.80 million
Malaysian tourist entries to Thailand
6.20 million
Outbound travellers
730,000
Vehicles crossing
191,445
Bukit Kayu Hitam TEU
156,665
Padang Besar TEU
626,661
Southern Thai cargos TEU
15,667
Ipoh Cargo Terminal TEU
62,666
Krabi / Kantang TEU
ASEAN exports, 2023, million tonnes. Source printed as IHS WTS (20 Nov 2023). The deck also prints 89% and says almost 90 percent stay in Asia-Pacific, with an Asia-Pacific line of 1,210.50 million tonnes. The percentage is quoted, not recomputed from the bars.
Universiti Utara Malaysia, Universiti Malaysia Perlis, Kolej Komuniti Bandar Darulaman, Giat MARA Kubang Pasu, Politeknik Sultan Abdul Halim Mu'adzam Shah, Akademi Binaan Malaysia (ABM) Wilayah Utara, Kampus Satelit CIAST, Kolej Pertanian Malaysia, Bukit Tangga, Institut Latihan Perindustrian Jitra, Institut Kemahiran Belia Negara Jitra, Pusat Latihan dan Bimbingan Veteran ATM, Jitra, CIDB Technologies Sdn Bhd (Kedah)
The three ringgit trade figures cover different geographies. They are not added and not swapped. Bilateral Malaysia–Thailand trade of about USD 13.55 billion in 2024 is a further plate, and the directional split is marked as an estimate.
The container figures are 2024 nodes that can be read on their own, not a capacity that can be summed. PKT's 240,000 TEU is inland-port capacity and is not the same number as the 191,445 TEU Bukit Kayu Hitam node. Penang Port and Port Klang are footnoted on the source as consolidated inflows from Padang Besar and BKH; the labels do not isolate them, so they are not repeated.
The institutions are copied from the NGX materials to show that training capacity exists in the radius. Nothing is called a partnership unless one has been signed.